An industrial licence may involve more preparation than a service or trading licence because the activity, site and operating process can affect approvals. Before committing to a facility, confirm the proposed manufacturing or processing activity with the licensing authority and relevant regulators.
Define the industrial activity
Describe what will be made or processed, the materials used, production capacity and intended customers. Activity classification determines the licence route and can trigger environmental, safety, technical or sector approvals. A warehouse or trading activity is not automatically equivalent to manufacturing.
Confirm the site before signing
Ask whether the selected premises are zoned and equipped for the proposed use. Review power, water, ventilation, loading access, fire-safety provisions, waste handling and any layout or engineering submissions that may be required. Confirm the lease and facility documentation accepted by the issuing authority.
Map the approvals
- Ask the licensing authority to confirm the exact industrial activity and code.
- Identify external approvals based on the product and process.
- Check technical drawings, machinery and safety documentation.
- Confirm environmental, civil-defence or utility requirements where applicable.
- Submit the application sequence before ordering equipment or fitting out.
Prepare a realistic timeline
Facility readiness, technical review and external approvals can affect the schedule. Build in time for document revisions and inspections. Get written guidance on the current sequence rather than relying on a general company setup timeline.
For help mapping the licence process, review our setup services and contact the team with the product and proposed facility location.
Frequently asked questions
Can I apply before I lease a factory?
Some steps may begin earlier, but premises evidence and technical details can be required. Confirm the sequence with the authority.
Does an industrial licence cover product approvals?
Not necessarily. Separate product or sector clearances may apply.
Can I operate from a standard office?
Premises suitability depends on the activity and operating process. Verify zoning and facility rules before signing.
Official source
Official guidance. Verify the latest requirements with the competent authority before applying.
What an industrial licence in Dubai is for
An industrial licence is intended for a business whose approved activity involves manufacturing, production or industrial operations. The exact activity code and licence route depend on the products, processes, location and authority. Before leasing a factory or buying equipment, confirm that the activity is licensable at the intended site and ask which approvals are needed from DET, a free-zone authority and sector regulators.
Plan the site and production activity together
Prepare a plain-language description of what you will make, the production steps, machinery, materials, storage needs, utilities, workforce and expected environmental impact. These details help the authority determine whether the selected activity and premises are compatible. An office or warehouse lease alone does not establish that a location is approved for manufacturing.
Approvals to investigate early
- Licence issuer: DET for an applicable mainland activity or the chosen industrial/free-zone authority.
- National industrial requirements: Invest in Dubai’s approvals list points to the Ministry of Industry and Advanced Technology / Ministry of Economy for a national industrial licence in relevant cases.
- Municipal, environment and safety review: depending on the process and site, relevant authorities may assess building use, environmental controls, fire safety, waste, emissions or storage.
- Product-specific approvals: food, medicines, cosmetics, chemicals, electrical goods and other regulated products can need specialist registration or conformity checks.
- Import/export and customs: machinery and raw materials may involve separate customs, import or product-compliance steps.
This is a screening list, not a claim that every factory needs every approval. Ask the issuing authority for the approvals mapped to your activity and site.
Industrial licence application preparation
- Define the exact manufacturing activity and products.
- Compare mainland and industrial-zone options based on operations, customers, utilities and logistics.
- Confirm ownership eligibility, legal form, external approvals and the premises requirements.
- Prepare corporate records, manager details, site information and technical documents requested.
- Obtain preliminary clearance before committing to a long lease or machinery purchase.
- Apply for the final licence and complete any inspections or registrations before production starts.
Industrial licence versus commercial trading
A manufacturing activity and wholesale or retail distribution are not automatically interchangeable. If the company will manufacture and also trade or distribute goods, ask whether both activities must appear on the licence and whether they trigger separate conditions. Operate only within the activities approved by the issuing authority.
Official sources
Start with Invest in Dubai’s business licensing services and its additional approvals list. Confirm technical and site requirements with the competent authority for your exact production process. Last reviewed: 14 October 2026.
Planning to Start a Company in the UAE?
Get a free consultation with Tdabeer. Tell us about your business activity and goals; our team can help you understand the company setup route, licensing steps and next actions.
Book a Free Company Setup Consultation on WhatsApp
WhatsApp: +971 50 698 3497





